NEW
FIBER CONSTRUCTION PROJECTS
· Sprint
Canada/ Rogers MI.IN.IL $800 million
· Cox AZ. $
94 Million
· Ericsson
Fiber Project $1 billion
· General
Dynamics $ 500 million
WORK
EXPERIENCE
General
Dynamics / Apeiron Oklahoma City 1-2016 – Present
· Senior OSP
engineer for Google Oklahoma City fiber project
· Responsible
for construction ride out, permitting, survey, and pole data loading for
Oklahoma City fiber project
· Responsible
for all training of in house, & sub- contractors
·
Implementation, and creation
of OSP engineering practices, and method of procedures for this project in
Oklahoma City
·
Expert knowledge of client
platform that is used to document field information /backbone, AF/DF route,
MST, FAP, & FDH locations to include vault placement location, and lid
types.
·
Responsible for establishing
method of construction that will be used to install the new fiber optic
cable.
· Responsible
for establishing running line for the project, as well as verifying the
constructability of this fiber plant
·
Developed
city BOM procedures for current project
·
Identify all
long lead permits
·
Developed
safety, and quality control program for current project
·
Identify
potential design issues for client, and suggest new routes that will save
time and money during the construction phase
·
Identified
reroute for current back bone reducing 14 long lead permits, as well as
potential savings of over $500,00.00
Ericsson /A.I.S. / Silicon Valley, 4-2015-12-2015
·
Engineer /Implementation
Manager III/Construction Manager III/ for Google fiber project
·
Engineered client backbone,
AF/DF route, MST, FAP locations to include vault placement locations for FDH
enclosures, fiber hut locations. Also method of construction that will be
used to install the new fiber optic cable.
·
Verified all long lead
permits, and gathered information for submission to the proper authority
·
Implementation, and creation
of splicing processes for this project using client requirements
·
Implementation, and creation
of OSP construction practices, and method of procedures for this project
·
Make ready design of poles;
identify potential pole issues, and correct issues found in GE map sight
·
Proficient in GO 95, and GO
128 California rules for aerial & underground construction
·
Proficient in NESC rules for
aerial & underground construction
·
Worked on Las Vegas OSP FTTH
project over seeing HDD, micro trenching, splicing, and testing by
construction crews
·
Assign daily, and weekly
tasking’s to engineering, survey crews and to GIS to ensure even flow of
project, and to remove any road blocks that could affect the flow of our
project
·
Ditch Witch, and Vermeer
certified
·
Trained OSP survey, and
engineering crews
·
Ericsson certified for OSP
construction/fiber splicing/ business practices
·
Conducted feasibility build
studies for Silicon Valley area cities to include method of construction, and
method of procedure for over 300 miles of new fiber plant
·
Thorough knowledge of
communication standards including RUS standards
·
Experience
with ESRI collector, GE map sight, Trimble, and underground radar equipment
·
Conduct deep
dives with new contractors coming on board to project
·
Train, new
inspectors, and new construction managers coming on to project
·
Monitor, and
control overtime on project to insure all personal are with in project
guidelines.
·
Develop city
BOM procedures for current project
·
Developed
safety program for current project
·
DWDM
knowledge
Cox
Communications / True Net Communications Phoenix, Arizona 1-2015- 4-2015
·
OSP fiber project supervisor
for Phoenix Brownfield new fiber build project FTTH
·
Manage splicing, and testing
of new fiber plant for 100 splicers, and 16 QC inspectors
·
Generate purchase orders,
material lists, and assign new splicing to contractors
·
Daily tracking of fiber
installations, splicing, and QC testing results
·
Trouble shoot fiber splicing
with OTDR, and have any splicing issues corrected & retested
·
Assign daily work to QC teams
to test new fiber splicing is to Cox standards
·
Meet with owners &
splicers in the field to verify daily production schedule is on target
·
Assign all construction
issues back to contractors to have corrected daily
·
Assign QC teams to verify
construction issues have been corrected
·
Certify, and turn over new
functional fiber plant to Cox Communications monthly
Splash
LLC/ H.U.D. Federal Contractor IL. IN. 8-2006-1-2015
·
President of
property Preservation Company which grew at 15 % yearly for 8 years
·
Responsible for $500 million
dollars of properties in Cook, & Lake county in Illinois, as well as
properties in Lake, Porter, La Porte, St. Joseph, Newton, and Jasper counties
in Indiana
·
Inspected, and certified all
inventory daily for HUD
·
Generate purchase order for
all contractors, assign new work, verify work was completed
·
Established new QC program
for HUD, and implement throughout coverage areas
·
Certified all properties were
safe, clean, and marketable for HUD
·
Properties were sold daily to
new home owners due to efficient management of properties
Sprint
Canada/Rogers Telecommunications / Gabe’s Construction MI. IL. IN. 5-2002-
1-2011
·
OSP fiber engineer, OSP
construction, and OSP protection
·
Monthly maintenance and
testing of HUT sites
·
Managed all construction
projects on CN railroad including boring and trenching associated with fiber
route.
·
Managed all construction
projects from central Michigan to Chicago Il., associated with OSP
·
Fiber restoration certified
member
·
Trouble shoot fiber splicing
with OTDR, and have any splicing issues corrected & retested
·
Correct, & pinpoint any,
and all outages from Michigan to Chicago
·
Train new OSP personnel
·
CN rail safety trained
QUALITY
CONTROL 1 LLC / MI.IN.MO.OK.IL 9-1999-5-2002
·
President of
a cable quality control company serving the Midwest
·
Responsible for a in house
team of 30 qc inspectors throughout the Midwest
·
Clients included, AT&T,
Wide Open West
·
Certified that new cable
plant was built to client specs and gig free
·
Worked daily with 100 plus
construction crews overseeing new plant being built
· Responsible
for monthly P&L statements
Gabe’s Construction / MI. IL. IN.OH. 1-1997-9-1999
·
Engineer, construction
inspector, fiber splicer for SBC new fiber project
·
Engineered new fiber route on
CSX R/R throughout Midwest
·
Verified that plant was being
built to SBC standards
·
Spliced, & tested new
fiber
·
Red lined fiber drawings as
plant was being built and completed
·
Responsible for inspecting
construction crews during build
·
Over saw long haul fiber
project for Rogers (Sprint Canada) fiber from Michigan to Indiana, and then
to Chicago